Skip to content
Diverzent

The Profitability Gap Calculator

What is the gap worth in your factory?

Enter your operation. The model returns an annual estimate built from four independent components, and the figure is yours at once, with nothing to fill in. The breakdown, component by component, comes with your board paper.

Your operation

Improvement assumptions

Annual profitability gap

$1.57M

$31K per line · 7.7% of current contribution

Where the figure comes from

Allocation efficiency
Locked
Capacity utilisation
Locked
Overtime avoided
Locked
Late delivery cost avoided
Locked
Annual contribution today
Locked
Annual shipment value
Locked
Annual overtime cost
Locked

Fill in the short form below to see the value of each of these seven lines here on the page, and to get them as a board paper for your board.

The four components are computed independently and do not overlap. Recovery from late delivery is capped at what is actually late today. The arithmetic is set out in full in the methodology note — a business case you cannot audit is one you cannot take to your board.

See the breakdown, and take it to your board.

Tell us who you are and we will open the breakdown of your estimate — $1.57M a year across 50 lines — here on the page, and format it as a board paper: your figures, the four components, and the method behind each.

Diverzent Ltd. is committed to protecting and respecting your privacy, and we’ll only use your personal information to administer your account and to provide the products and services you requested from us.

We use this to send your board paper and to follow up once. We do not sell or share your details, and one reply stops us contacting you again. You get the breakdown and the paper whether or not you tick the box above.

Annual profitability gap

$1.57M

See the result

How the model works

Utilisation and efficiency are kept separate. Utilisation asks whether a line is loaded at all; efficiency asks how well it performs while running. Combining them — as most vendor models do — double-counts the same minutes.

Allocation gains apply to loaded minutes only. Utilisation gains are valued at your current efficiency, not an improved one. The two cannot overlap.

Recovery from late delivery is capped at what is actually late today. A factory already at 99% on-time cannot recover three percentage points, and a model that lets it is a model your CFO will reject.

This is an estimate built on your inputs and published industry benchmarks, not a quotation or a guarantee. Its purpose is to give you a defensible number to interrogate. If you think it is wrong, we would rather hear why.

Tell us where it is wrong.

The most useful conversation we have with a factory is the one where they correct our arithmetic using their own numbers. Bring a month of your order book and we will run it properly.

We answer within one working day.